Views: 1365|Replies: 2

技术负责人? [Copy link] 中文

Rank: 8Rank: 8

Post time 2005-2-28 11:39:52 |Display all floors
项目技术负责人、项目综合技术员在制定施工技术方案的同时将制定分项工程安全技术措施,
The Project technical responsible person and technician shall work out engineering production safety measures along with the construction technical scheme.

Use magic tools Report

Rank: 4

Post time 2005-2-28 12:27:16 |Display all floors

Re: Only reference

项目技术负责人、项目综合技术员在制定施工技术方案的同时将制定分项工程安全技术措施,
The Project technical responsible person and technician    [the chief(head)  of technical project and general technician]     shall work out [ a part of safty plan of construction]   engineering production safety measures along with the construction technical scheme.

Use magic tools Report

Rank: 4

Post time 2005-2-28 13:23:32 |Display all floors

CTO

Chief Technical Officer

Use magic tools Report

You can't reply post until you log in Log in | register

BACK TO THE TOP
Contact us:Tel: (86)010-84883548, Email: blog@chinadaily.com.cn
Blog announcement:| We reserve the right, and you authorize us, to use content, including words, photos and videos, which you provide to our blog
platform, for non-profit purposes on China Daily media, comprising newspaper, website, iPad and other social media accounts.